Bond Issue Projects The map below indicates the areas where the city is or will be improving sewer and stormwater conditions. These include the $3.6 million Bond Projects as well as several "Cash" Projects.
CRITERIA FOR RANKING STORM WATER DRAINAGE PROJECTS The following are the criteria used to rank the various drainage projects that are on the SWM Board Project List.
|
|||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||
|